Sheila Silver Library – reminder about refurbishment

Work is continuing on the redevelopment of the first floor of the Sheila Silver Library with construction due to be completed by mid-October 2016. The completed first floor will include space for group study, printing, book stock 001-599, three IT teaching labs, and four bookable Student Meeting Rooms. The ground floor of the Library will also see changes in October, when the book stock will be moved to the first floor and replaced with a group study area, and IT labs LSB G28 and G29 will be returned to teaching.

Books within the 001-599 range will be unavailable for brief periods in October whilst it moves from ground to first floor. You can put a hold on anything you need during this time and Library staff will be available to retrieve books for you.

We’re looking forward to seeing the newly refurbished floor and hope you are too.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s